跳到主要內容

簡易檢索 / 詳目顯示

研究生: 吳豐全
Feng-Chuan Wu
論文名稱: 多載量AGV的控制方法
指導教授: 何應欽
Ying-Chin Ho
口試委員:
學位類別: 碩士
Master
系所名稱: 管理學院 - 工業管理研究所
Graduate Institute of Industrial Management
畢業學年度: 89
語文別: 中文
論文頁數: 69
中文關鍵詞: 無人搬運車派車法則及時生產系統投標系統模擬
外文關鍵詞: Multiple-load AGV, Dispatching, Bidding, Simulation, JIT
相關次數: 點閱:9下載:0
分享至:
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報


  • Chapter I Introduction.....................................1 1.1 Background.............................................1 1.2 Research Objective.....................................1 1.3 Thesis Organization....................................2 Chapter II Literature Review...............................3 Chapter III Methodology....................................5 3.1 Problem Environment....................................5 3.2 Solution Structure.....................................6 3.3 Part I.................................................8 3.3.1 Collection Module....................................8 3.3.2 LAT (Latest Arrival Time) Determination Module.......9 3.4 Part II ...............................................15 3.4.1 Bid-Matching (BM) Module.............................16 3.4.2 Bid-Collection Expiration Time (BCET) Module.........18 3.4.3 Vehicle-To-Part Bid Determination (VTPBD) Module.....19 3.4.4 Part-To-Vehicle Bid Determination (PTVBD) Module.....20 Chapter IV Experimental Design and Analysis................21 4.1 Experiment Environment and Assumptions.................21 4.2 Simulation Experiments.................................25 Chapter V Conclusion.......................................32 5.1 Conclusions............................................32 5.2 Recommendations for Future Study ......................33 Reference..................................................34 Appendix A: Experimental Result............................35 Appendix B: SPSS 10.0 Test Result..........................41 Appendix C: Arena 4.0 Logic................................44 Appendix D: VBA Source code................................46

    Bartholdi, J. J., and Platzman, L. K., 1989, “Decentralized control of automated guided vehicles on a simple loop,” IIE Transactions, 21(1), 76-81.
    Egbelu, P. J., 1987, “Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system,” Journal of Manufacturing Systems, 6(3), 209-221.
    Egbelu, P. J., and Tanchoco, J. M. A., 1984, “Characterization of automatic guided vehicle dispatching rules,” International Journal of Production Research, 22(3), 359-374.
    Ho. Y. C., and Moodie, C., L., 1996, “Solving cell formation problems in a manufacturing environment with flexible processing and routeing capabilities,” International Journal of Production Research, 34(10), 2901-2923.
    Lee, J., Tangjarukij, M., and Zhu, Z., 1996, “Load selection of automated guided vehicles in flexible manufacturing systems,” International Journal of Production Research, 34(12), 3388-3400.
    Occena, L. G., and Yokota, T., 1991,“Modeling of an automated guided vehicle system (AGVs) in a just-in-time (JIT) environment,” International Journal of Production Research, 29(3), 495-511.
    Occena, L. G., and Yokota, T., 1993, “Analysis of the AGV loading capacity in a JIT environment,” Journal of Manufacturing system, 12(1), 24-35.
    Ozden, M., 1988, “A simulation study of multiple-load-carrying automated guided vehicles in flexible manufacturing system,” International Journal of Production Research, 26(8), 1353-1366
    Tanchoco, J. M. A. and Co, C. G., 1994, “Real-time control strategies for multiple-load AGVs,” Material Flow Systems in Manufacturing, edit by Tanchoco, J. M. A. (Chapman & Hall), pp. 300-331.
    Tompkins. J.A. and White,J.A, 1984, “Facility Planning ,” Wiley, New York.
    Yim. D., and Linn. R. J., 1993,“Push and pull rules for dispatching automated guided vehicles in a flexible manufacturing system,” International Journal of Production Research, 31(1), 43-57.

    QR CODE
    :::