| 研究生: |
周世澧 Shih-li Chou |
|---|---|
| 論文名稱: |
以RF-UP工法縮短高層鋼構造建築營造工期之研究 The Research on the Implementation of RF-UP Construction Method to Shorten Building Superstructure Schedule |
| 指導教授: |
謝定亞
Ting-ya Hsieh |
| 口試委員: | |
| 學位類別: |
碩士 Master |
| 系所名稱: |
工學院 - 土木系營建管理碩士在職專班 Executive Master's Program in Construction Management, Department of Civil Engineering |
| 畢業學年度: | 99 |
| 語文別: | 中文 |
| 論文頁數: | 111 |
| 中文關鍵詞: | RF-UP工法. 、縮短結構體工期 、屋突先行施工法 |
| 外文關鍵詞: | Penthouse Structure Beforehand Construction Meth, RF-Up Construction Method., Shorten Super Structure Program |
| 相關次數: | 點閱:12 下載:0 |
| 分享至: |
| 查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
目前國內之營建市場,尤其在1999年921大地震後,在高層建築之住宅大樓之使用者,對於大樓結構安全要求之意識提高,往往要求建商能以供應高級的鋼骨構造之住宅大廈為唯一首選,因此在國內建商因循此趨勢,亦在高級住宅市場之住宅大樓,以建構鋼骨構造之住宅大樓為首要目標。
一般營建工程的執行所要求最基本的三大目標:成本、品質、工期,然而工程界對於進度的掌控皆著眼在縮短結構體工期之施工方法,著墨較深,其中發展出來有:1.傳統順打工法(以增加工時及輪班接力式) 2.雙順打工法3.逆打工法4.R-UP工法等,其僅涵蓋在整體工程中最容易控管的三分之一之工期,但是以整體營建管理的總體進度之掌控角度,尚有不足之地方,以整體工期進度之掌握,最重要的是要有連續性,且將利用工時與工序之安排來將浮時降低,來達到縮短工期之成效。
本研究之目的,針對台灣區在高層建築之施工管理與步驟作適當的創新與調整,即是將屋頂突出物(Penthouse)頂層提前於主體建築物之屋頂層前一層完成,此工法本研究將其定義為“屋突先行施工法(RF-UP工法)”,使後續之電梯與梯廳工程在完全掌握下完成,以期對於營建業在縮短營建整體工期具有突破性之貢獻。
Among the housing market in Taiwan, especially after the 921 Earthquake in 1999, the customers of high rise residential buildings have largely raised their concerns of having safer building structure, and consequently pursue the building developers to offer steel structure mansions as their first buying priority. As a result, the building developers follow this trend and target to offer steel-structured residential buildings to the high end housing market.
Time, cost and quality are the three factors that play a significant role in the execution of construction projects. The construction industry has developed several methods aiming to shorten the construction program of super structure by controlling and monitoring the program, such as (1) Conventional construction method (by increasing working hours and shift work), (2) Up-Up construction method, (3) Top-Down construction method, (4) R-Up construction method, and etc. However, all of the above only cover the most controllable one of the three key factors, “Time”, but still not fully cover the “Time” issue as the aspect of overall construction management. In regard to the controlling of “Time”- the overall program, the most important approach is to ensure the continuity of all tasks by re-arranging working hours and re-scheduling tasks to reduce float times, and consequently shortening the overall program.
This research is to introduce innovative approach and appropriate adjustment to the construction method and management to high rise building projects in Taiwan, i.e. scheduling the Penthouse structure completed one floor prior to the roof floor structure of the main building, so that the successive lift installation and lift lobby fitting out can be proceeded at the same time under control. This construction method is defined by this research as “RF-Up construction method”. It is expected this research could make a breakthrough to the construction industry in shortening overall construction program.
一、日文文獻
1.熊野隆喜、坂本 成、娟川邦夫、淺井 濟、家田高好,「次世代建築生產」,東洋書店,1994。
二、中文文獻
1.林耀煌,「高層建築基礎開挖工法與設計實例」,常松出版社,1983。
2.黃文隆,「建築基礎工程採用壁樁及其他工法成效之分析研究」,國立中央大學土木工程研究所,碩士論文,2008。
3.林瑞賢,「適宜新竹地區深開挖工法介紹」,新竹建築雜誌,2007。
4.林國良,「高層建築地下施工法之規劃」,義守大學論壇與科學技術研討會, 2008。
5.建築技術規則,營建雜誌社,2010。
6.余家祥,「以案例式推理建構建築工程成本估算系統」,國立中央大學土木工程研究所碩士論文,2000。
7.沈士傑,「建築工程隱藏性成本之探討-以逆打施工之建築工程為例」,國立中央大學土木工程學系碩士在職專班碩士論文,2007。
8.傅文萍,「實獲值管理於中小型營造廠工程成本控制」,中華大學營建管理研究所碩士論文,2008。
9.呂晏瑋,「營建專案全面成本評估架構之建立」,中國科技大學土木與防災應用科技研究所碩士論文,2005。
10.吳萬益,「1邸大樓興建施工計劃」,建國營造,2007。
11.林培元,「吾彊住宅大樓施工計劃書」,華熊營造,2010。