| 研究生: |
賴鈺蒨 Yuh-chiann Lay |
|---|---|
| 論文名稱: |
系統性橋梁維修評選之研究 |
| 指導教授: |
顏上堯
Shang-Yao Yan |
| 口試委員: | |
| 學位類別: |
碩士 Master |
| 系所名稱: |
工學院 - 土木工程學系 Department of Civil Engineering |
| 畢業學年度: | 89 |
| 語文別: | 中文 |
| 論文頁數: | 128 |
| 中文關鍵詞: | 橋梁維修評選 、效益評估 、多重背包問題 、組合最佳化 |
| 外文關鍵詞: | bridge maintenance evaluation, benefit evaluation |
| 相關次數: | 點閱:5 下載:0 |
| 分享至: |
| 查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
本研究提出一系統性橋梁維修評選架構,其可作為各橋梁管理單位評選維修橋梁、編列年度預算、乃至採用續進式決策之參考依據。首先利用劣化預測評估橋梁未來狀態,同時藉以計算決策者與用路人經由維修橋梁可得效益。最後在系統總效用最大的前提下,考慮橋梁對間的相關性,並利用數學規劃的方法針對橋梁的一般性維修構建一組合最佳化評選模式。對於選優模式之求解,則分別利用傳統鄰近搜尋及一新式啟發式演算法進行之。為評估此決策模式之效果,本研究進行一範例測試,並針對橋梁評選參數進行敏感度分析發現結果良好,應可做為實務應用之參考。
In this research, we develop a systematic framework for evaluating bridge maintenances. The framework is divided into four stages. At first, we use Markov Chain theory to forecast the future condition state of a bridge. According to the bridge’s state, we use both agency and user benefit as the total benefit that the system can get from maintaining the bridge. After evaluating the total benefit, we develop an optimization model that determines the best bridges to be maintained with the object of maximizing the system benefit, considering the budget constrain, correlation between every bridge pair, and other related constrains. To solve the model, we apply a local search algorithm and a new heuristic algorithm. Finally we perform a case study and the solution algorithm to evaluate our model. The results show that the model and the solution method could be useful.
台灣營建研究院,橋梁安全維護與管理,台灣營建研究院,台北,第1-119頁(1999)。
台灣營建研究院,「台灣地區橋梁安全管理策略探討與制定」,交通部科技顧問室研究報告,MOTC-STAO-RD1503-86,台北(1997)。
交通技術準規範公路類公路工程部,「交通工程手冊」,幼獅文化事業公司,台北(1989)。
交通部統計處,「台灣地區旅運時間價值調查報告」,台北(1996)。
李其灃,「中小型交通建設評估模式之研究」,碩士論文,國立中央大學土木工程研究所,中壢(2000)。
呂蕙美,「城際公路網動態交通量指派之研究」,碩士論文,國立成功大學交通管理科學研究所,台南(1994)。
吳澤成,「都市公共工程建設計劃評估模式之研究」,碩士論文,國立中央大學土木工程研究所,中壢(1998)。
亞聯工程顧問公司,「亞聯多重交通量分派模式之建立」,台灣北部區域第二高速公路計劃可行性研究運輸規劃專題報告,No. 3,台北(1985)。
林文祺,「台北市內道路交通行車成本之研究」,碩士論文,國立中興大學都市計劃研究所,台南(1987)。
林俊豪,「橋梁構件破壞狀態值預測及優選排序模式之研究」,碩士論文,國立中央大學土木工程研究所,中壢(1999)。
范佐培,「高速公路建立動態路徑導引系統之交通績效研究」,碩士論文,國立成功大學交通管理科學研究所,台南(1991)。
陳志明,「台灣區公路橋梁耐震補強優選評估模式之研究」,碩士論文,國立中央大學土木工程研究所,中壢(1998)。
陳高村、曾招雄,「道路交通事故損失幣價值估算之研究」,交通事故與交通違規之社會成本推估研討會論文集,台北,第49-64頁(2000)。
許志義,「多目標決策」,五南圖書出版公司,(1994)。
黃宣菁,「台灣地區公路橋梁管理系統架構之研究」,碩士論文,國立中央大學土木工程研究所,中壢(1997)。
劉馨隆,「專案投資組合及其時程與資源規劃之研究」,碩士論文,國立中央大學土木工程研究所,中壢(1994)。
劉馨隆,「公共工程建設計劃時序性組合規劃之研究」,博士論文,國立中央大學土木工程研究所,中壢(2000)。
鄧振源,「相關性運輸投資計畫選擇之研究-非模糊與模糊多目標規劃方法」,博士論文,國立交通大學交通運輸研究所,新竹(1992)。
Azis, Z. P., “Analytic Hierarchy Process in The Benefit-Cost Framework:A Post-Evaluation of The Trans-Sumatra Highway Project,” European Journal of Operational Research, Vol. 48, pp. 38-48(1990).
Charon, I. and O. Hudry, “The Noising Method: a New Method for Combinatorial Optimization,” Operation Research Letters, Vol. 14, No. 3, pp.133-137(1993).
Dueck, G. and T. Scheuer, “Threshold Accepting: A General Purpose Optimization Algorithm Appearing Superior to Simulation Annealing,” Journal of Computation Physics, Vol. 90, pp.161-175(1990).
Georgi, H., Cost-Benefit Analysis and Public Investment in Transportation:A Survey, Butterworths, London(1973).
Guignier, F., and Madanat, S.,”Optimization of Infrastruture Systems Maintenance and Improvement Policies,”Journal of Infrastruture Systems, Vol. 5, No. 4, pp. 124-134(1999).
George Stukhart, PE, A Bridge Management System for Texas, AACE TRANSPOTION,(1991).
Glover, F. and M. Laguna, Tabu Search, Kluwer Academic Publishers, Massachusetts, (1997).
Hill, M., “A Goal Achievement Matrix for Evaluating Alternative Plans,” Journal of The American Institute of Planners, Vol. 34, No. 1, pp.19-38(1968).
Holmes, J. C., “An Ordinal Method of Evaluation,” Urban Studies, Vol. 9, No. 1, pp. 179-191(1972).
Hwang, C. L., and Masud, A. S. M., Multiple Objective Decision Making-Methods and Applications:A State of The Art Survey, Springer-Verlag, New York(1979).
Jiang, M., Corotis, B. C.,and Ellis,J. H.,”optimal Life-Cycle Costing with Partial Observability,” Journal of Infrastruture Systems, Vol. 6, No. 2, pp. 56-66(2000).
Johnston, D. W., and Zia, P.,”Level-of-Service for Bridge Evaluation,” Transportation Research Record, ASCE, Vol. 119, No. 1(1993).
Keeney, R. L., and Raiffa, H., Decision with Multiple Objectives: Preferences and Value Tradeoffs, John Wiley and Sons, New York (1976).
Khorramshahahgol, R. and Steiner, H. M., “Resource Analysis in Project Evalution:A Multicriteria Approach.” Journal of Operational Research Society,Vol. 39, No. 9, pp. 795-803(1988).
Kirkatrick, S., C. D. Gelatt and M. P. Vecchi, “Optimization by Simulated Annealing,” Science, Vol. 220, pp. 671-680(1983).
Leinbach, T. R., and Cromley, R. G., “A Goal Programming Approach to Public Investment Decisions: A Case Study of Rural Roads in Indonesia,” Socio-Economic Planning Sciences, Vol. 17, No. 1, pp. 1-10 (1983).
Leinbach, T. R, and Cromley, R. G., “Modeling Intergrated Development Investments in Rural Areas: An Indonesian Illustration,” International Regional Science Review, Vol. 12, No. 2, pp. 229-243,(1989).
Morisugi, H., el al., “Measurement of Road User Benefits by Means of A Multi-Attribute Utility Function,” Papers of the Regional Sciences Association, Vol. 46, pp. 31-43 (1981).
Neumann, L. A., and Dresser, J., “New Approach for Analyzing Highway Program Choices and Trade-offs,” Transportation Research Record, No. 724, pp. 1-7 (1981).
Nowlan, D. M., “The Use of Criteria Weights in Rank Ordering Techniques of Project Evaluation,” Urban Studies, Vol. 12, No. 2, pp. 169-176 (1975).
Pearman, A. D., et al., “The Use of Multicriteria Techniques to Rank Highway Investment Proposals,” in: Lockett, A. G., and Idlei, G.,(eds.) Improving Decision Making in Organizations, pp. 157-165, Springer-Verlag, New York (1989).
Polus, A., and Tomecki, A. B., “A Level-of-Service Framework for Evaluating Transportation System Management Alternatives,” Transportation Research Record, No. 1081, pp. 47-53 (1985).
PONTIS Version 2.0 User’s Manual:A Network Optimization System for Bridge Improvements and Maintenance, U.S. Department of transportation, Washington, D.C.,FHWA-SA-93-083(1993).
PONTIS Version 2.0 Technical Manual:A Network Optimization System for Bridge Improvements and Maintenance, U.S. Department of transportation, Washington, D.C., FHWA-SA-94-031(1993).
Reeves, C. R., Modern Heuristic Techniques for Combinatorial Problems, John Wiley and Sons, Inc.,(1993).
Saaty, T. L., “Scenarios and Priorties in Transport Planning: Application to the Sudan,” Transportation Research, Vol. 11, pp. 343-350 (1977).
Scherer, W. T., Glagola, D.M., “Markovian models for bridge maintenance management, “ Journal of Transportation Engineering, Vol.120 (1), pp.37-51 (1994).
Smilowitz, K., and Madanat, S.,”Optimal Inspection and Maintenance Policies for Infrastructure Networks,” Journal of Infrastruture Systems, Vol. 15, No. 1, pp.5-13(2000).