跳到主要內容

簡易檢索 / 詳目顯示

研究生: 張軒誌
Hsuan-Chih Chang
論文名稱: 潛盾隧道開挖沉陷與襯砌行為之有限元素分析
指導教授: 張瑞宏
Jui-Hung Chang
口試委員:
學位類別: 碩士
Master
系所名稱: 工學院 - 土木工程學系
Department of Civil Engineering
畢業學年度: 91
語文別: 中文
論文頁數: 94
中文關鍵詞: 離心模型試驗未襯砌長度深徑比襯砌彎矩襯砌軸力
外文關鍵詞: (C/D)ratio, centrifuge model tests, moment of tunnel lining, unlined length, axial force of tunnel lining
相關次數: 點閱:12下載:0
分享至:
查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報
  • 潛盾工法可降低開挖對鄰近結構物及交通環境所造成之衝擊,且具有高效率與安全施工之特徵,故近年來潛盾工法廣泛被國內工程界所使用。本研究採用有限元素法,針對三維單隧道開挖問題進行分析,分析時採用ABAQUS有限元素分析程式作為數值分析工具。分析內容包括:隧道開挖所造成之地表沉陷、塑性區之分佈以及襯砌彎矩與軸力之分佈等。
    本研究亦將數值分析之結果與離心模型試驗之結果相互比較,藉此驗證數值分析模型的正確性。此外,本文也針對深徑比(C/D)以及未襯砌長度與隧道直徑比(P/D)等參數之影響進行研究。


    Shield tunneling has been widely used on tunnel construction due to its relatively minor mimpact on surrounding environment. In this study, finite element method is applied to analyze three-dimensional tunneling problems. The analyses contain surface settlement due to tunneling, yielding regions caused by tunneling, and the distribution of moment and axial force in tunnel lining.
    The numerical results from ABAQUS were compared with the experimental results from lab centrifuge model tests. This study also investigated the effect due to (C/D)ratio, and (P/D)ratio.

    中文摘要 I 英文摘要 II 目 錄 III 表目錄 VI 圖目錄 VII 符號說明 XI 第一章 緒 論 1 1.1 前言 1 1.2 研究動機與目的 2 1.3 研究方法 3 1.4 論文內容 3 第二章 文獻回顧 5 2.1物理模型試驗 5 2.2 經驗法與現場量測 8 2.3數值分析法 9 第三章 分析方法與模型模擬 13 3.1 有限元素法 13 3.2 MSC/Patran之簡介 14 3.3 ABAQUS/CAE之簡介 15 3.4單隧道之模型模擬 16 3.4.1單隧道模型試驗 16 3.4.2 單隧道之數值模擬 16 3.4.3單隧道邊界條件之模擬 17 3.4.4單隧道載重施加方式 17 3.4.5 單隧道網格之收斂研究 18 3.5 超載係數(Overload factor) 18 3.6 襯砌彎矩與軸力 21 第四章 模擬結果與討論 39 4.1 數值分析驗證 39 4.2 模擬結果與討論 39 4.2.1 地表沉陷分佈型態 40 4.2.2塑性區之分佈範圍 41 4.2.3襯砌彎矩與軸力 42 4.3 參數研究 44 4.3.1深徑比之影響 45 4.3.2未襯砌長度之影響 45 第五章 結論與建議 84 5.1結論 84 5.2 建議 86 第六章 網格收斂補述 88 參考文獻 91

    【1】Adachi,T.,Kimura,M.and Osada,H.,”Interaction Between
    Multi-Tunnels Under Construction”, Eleventh Southest
    Asian Geotechnical Conference,Singapore,pp.51~60(1993) .
    【2】Atkinson,J.H. and Potts,D.M.,”Subsidence Above Shallow
    Tunnels in Soft Ground”,ASCE,Journal of Geotechnical
    Engineering,Vol.103.No.GT4,pp.307~325 (1977) .
    【3】Nomoto,T., Mito,K.,Imamura,S., Ueno,K. and Kusakabe
    ,O., ” A Miniature Shield Tunneling Machine for a
    Centrifuge”Centrifuge 94,pp.699~704 (1994) .
    【4】Yoshimura,H.,Miyabe,K. and Tohda,J.,”Response of a
    Tunnel Lining due to an Adjacent Twin Shield
    Tunneling”,Centrifuge 94,pp.693~698 (1994) .
    【5】李崇正,「軟地通隧引致之地盤沈陷受鄰近建物基礎影響研究-第四年」,國科會中央大學土木系,國科會專題研究報告,中壢 (1996) 。
    【6】李崇正「黏土層中併行潛盾隧道之互制現象研究(1)」,國科會專題研究報告,中壢 (1998) 。
    【7】林智文,「潛盾隧道開挖面穩定分析」,碩士論文,國立中央大學土木工程研究所,中壢(2000)。
    【8】吳建儒,「潛盾隧道開挖面穩定與周圍土壓力之離心模擬」,碩士論文,國立中央大學土木工程研究所,中壢(2001)。
    【9】Peck,R.B,“Deep Excavation and Tunneling in Soft
    Ground”,State of Art,Proc.7th Int.Conf.on Soil
    Mech.Found.Eng.,State of Art volume,pp.255~290(1969).
    【10】Cording,E.J. and Hansmire,W.H., “Displacement Around
    Soft Ground Tunnels”,Proc.6th Panamerican Conf. on Soil Mech.
    And Found.Eng.,Buenon Aires,pp.571~633(1975) .
    【11】Clough,G.W. and Schmidt,B.,“Design and Performance of Exca
    vations and Tunnels in Soft Clay”,in Soft Clay Engineering, edited by Brand,E.W. and Brenner,R.P.,pp. 600~634(1981) .
    【12】Fang,Y.S.,Pan,M.D. and Lin,G.J.,”Time and Settlement in EPB
    Shield Tunneling”,Tunnels and Tunneling,pp.27~28(1993) .
    【13】Butler,R.A and Hampton,D.,”Subsidence over Soft Ground Tun
    nel”, ASCE,J. Geotechnical Engineering Division,Vol.101,
    No.GT1,pp.35~49(1975) .
    【14】Hansmire,W.H. and Cording,E.J. ,discussion of
    “Subsidence over Soft Ground Tunnel,by Roger A.Butler and
    Delon Hampton, ASCE, J.Geotechnical Engineering Division,
    Vol.102,No.GT3,pp.259~261 (1976) .
    【15】Hansmire,W.H. and Cording,E.J.,”Soil Tunnel Test Section Case
    History Summary”, ASCE ,J.Geotechnical Engineering,Vol.111,
    No.11,pp.1301~1320 (1985) .
    【16】Perez,S.A.,”Experience gained through tunnel instrumentation” ,
    Proc.10th Int.Conf. on Soil Mech. And Found. Eng.,pp.345~
    352 (1981) .
    【17】Aoki,T., and Jang,H.K.,”Determination of Plastic Regions
    Around Underground Openings by a Coupled Boundary
    Element-Characteristic Method”,International Journal for
    Numerical and Analytical Methods in Geomechanics, Vol.16,
    pp.701~716 (1992) .
    【18】E.Detournay and C.Fairhurst, ”Two – dimensional Elastoplastic
    Analysis of a Long,Cylindrical Cavity Under Non-Hydrostatic
    Loading”,Int.J.Rock Mech.Min. Sci.and Geomech.Abstr.,Vol.24,
    No.4,pp.197~211,(1978).
    【19】Finno,R.J. and Clough,G.W.,”Evaluation of Soil Response to
    EPB Shield Tunneling”,ASCE,J.Geotechnical Engineering,
    Vol.111,No.2,pp.155~173 (1985) .
    【20】Hisatake,T. and Ito,T.,”Estimation method of ground
    surface subsidence due to parallel shields tunneling
    and its application to practical problems”, ( In Japanese).
    Proceeding of the Japanese Society of Civil Engineers,No.332,
    pp.75~83 (1983) .
    【21】Ou,C.Y.and Cherng,J.c.,“Effect of tail void clousure on Ground
    Movement During Shield Tunneling in Sandy Soil”, Journal of
    Asian Geotechnical Society ,Geotechical Engineering, Vol.26,
    No.1,pp.17~32 (1995) .
    【22】Sloan,S.W. and Assadi,A., ”Undrained stability of a plane
    strain heading “Can.Geotech.J., Vol.31,pp.443~450 (1994) .
    【23】方永壽 ,「台北市潛盾機隧道施工對地盤沈陷之影響」,國立
    交通大學土木系,國科會專題研究報告,新竹 (1990)。
    【24】鄭建志,「軟地通隧引致地盤沈陷之有限元素分析」,碩士論文,
    國立中央大學土木工程研究所,中壢 (1999)。
    【25】林建良,「潛盾隧道周圍土壓力之分布」,碩士論文,國立中央
    大學土木工程研究所,中壢 (1999)。
    【26】吳淑媛,「軟土隧道襯砌應力與地盤變位之數值分析」,碩士論文,國立中央大學土木工程研究所,中壢 (2001)。
    【27】彭德俊,「黏土層中併行潛盾隧道互制現象之有限元素分析」,
    碩士論文,國立中央大學土木工程研究所,中壢 (2000)。
    【28】陳翰平,「潛盾隧道開挖沈陷之有限元素分析」,碩士論文,國立中央大學土木工程研究所,中壢 (2001)。
    【29】李金芳,「黏土層中潛盾隧道開挖沈陷之有限元素分析」,碩士論文,國立中央大學土木工程研究所,中壢 (2002)。

    QR CODE
    :::