戴勝鵬 Sheng-Peng Tai |
|---|---|
| 論文名稱: |
高科技廠房在工期限制下最佳化排程之研究 The research of the best procedures for Hi-tech factory on the limitation of construction time- With the exemplar of clean room construciton of Chunghwa Picture Tubes, Ltd. |
| 指導教授: |
顏上堯
Shangyao Yan |
| 口試委員: | |
| 學位類別: |
碩士 Master |
| 系所名稱: |
工學院 - 土木工程學系在職專班 Executive Master of Civil Engineering |
| 畢業學年度: | 94 |
| 語文別: | 中文 |
| 論文頁數: | 70 |
| 中文關鍵詞: | 最佳化 、無塵室工程 、趕工 、線性規劃 |
| 外文關鍵詞: | non-dust factory, Optimal Model, Linear Programming, crashing |
| 相關次數: | 點閱:19 下載:0 |
| 分享至: |
| 查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
摘 要
所謂高科技廠房,在國內若干專家學者概述為廠房中,所生產的產品其高科技術含量較高或製程需用較多高科技專業知識或專業技術而製造程中,需要較多高科技技術或設備且周邊環境的控制條件亦較高。建廠工程工期如未達到適當進度,會影響後續機械按裝時程,更會影響整體建廠的完成,造成公司產品、生產延後,使得公司的客戶及訂單流失,減少公司利潤,所以整體建廠時程要掌控好,由其是高科技廠房講究時間就是金錢。所以需要一套建廠趕工模式來幫助建廠。
因此趕工是高科技廠房建廠實務中,常遭遇到的情況,而不得不施行;本文則以一無塵室工程為例,因無塵室工程為高科技廠房核心,工程不能有所延遲完成。在工程期限的要求下,採用線性規劃的數學方法,建構一數理模式,並透過Lindo決策 軟體來加以求解,為測試模式效果 ,我們進行範例測試 ,結果可得本研究較CPM 方法為優。提出符合工期限制並負擔最低成本的趕工策略;從而由實務之蒐集、整理。模式建構及決策軟體之運用求解,確實地將與理論整合,提供一套符合工程需求且具體有效之策略程序。
Abstract
What is called“High technology manufactory”, stated by our domestic professionals is when manufacture products , we need more high technical knowledge and more restricted control for surrounding environment.If the schedule does not meet during construction, it will delay the further machinery install and whole project, also, it will postpone the product manufacture and lead to lose customer and order eventually. Therefore, to well control the schedule is very critical . So that it need to formulate one model to pursue engineering to assist manufactory construction.
To work overtime to catch up with the schedule is very common in this field. This research makes non-dust factory engineering as an example. It is the kernel engineering in the high technology manufactory. The schedule control is very important. During the limitaion of working period, to use math. linear method to construct a computation model and via Lindo decision .We want to get the effects of the model in this research that need to proceed an example of test, the result of model is more excellent than CPM in finally. applying to proper software tool to calculate an optimum project working days and cost for the best policy of catching up. Besides, in practical, to search and collect relatedmaterials, to use construction model, to apply into decision making tools then, integrate with the theory to apply a effective and best strategic procedure to fulfill the engineering requirement.
參考文獻:
一、中文部份
1.林金面,營建管理學, 文笙書局(2005年)。
2.何正吉,「公共工程監造成本控制最佳化研究」,碩 士 論 文,國立中央大學土木工程學系研究(2002年)。
3.侯威銘,營建管理, 文笙書局(2003年)。
4.陳明德、陳武林,實用管理科學 ,前程文化事業(2005年)。
5.葉志鴻,「電力工程在工期限制下之最佳化排程」,台電工程月刊,第627期(2000年)。
6.廖國禎,營建管理科學, 科技圖書(股)公司(2003年)。
7.劉智遠,「公共工程進度計算方式之認定研究」,碩 士 論 文,國立中央大學營建管理研究所(2005年)。
8.潘昭賢、葉瑞徽,「作業研究」,滄海書局(2002年)。
9.顏上堯,「最佳化設計與管理」講義,國立中央大學土木研究所(2004年)。
10.蘇雄義、涂保民, 「專案管理之線性規劃模式及應用」, 輔仁管理評論
(2002年)。
11.顧梓承,「土石方工程調派最佳決策模式之研究」,國立中央大學土木工程學系碩士論文,(2001年)。
二、英文部份
1.Lock, D. Prject management.4 th ed .Central Book P ub .Co Taipei Taiwan ,1988.
2. Wei, L.CPM/Time,CPM/Cost,and their Applications, Chinese S cience Research lnstitute ,Circular Report No.45, pp.94,1987.