| 研究生: |
林家弘 Chia-Hung Lin |
|---|---|
| 論文名稱: |
全斷面隧道開挖及推進之有限元素模擬與分析 |
| 指導教授: |
張瑞宏
Chang, J.H. |
| 口試委員: | |
| 學位類別: |
碩士 Master |
| 系所名稱: |
工學院 - 土木工程學系 Department of Civil Engineering |
| 畢業學年度: | 93 |
| 語文別: | 中文 |
| 論文頁數: | 103 |
| 中文關鍵詞: | 地表沉陷 、非均質土層 、潛盾機推進 、回填灌漿 、隧道交叉 、平面應變 、大地應力 |
| 外文關鍵詞: | non-homogeneous soil layers, intersectional tunnel, ground settlement, backfill grouting material, plane strain, earth stress balanced, shield tunneling advance |
| 相關次數: | 點閱:7 下載:0 |
| 分享至: |
| 查詢本校圖書館目錄 查詢臺灣博碩士論文知識加值系統 勘誤回報 |
本文研究針對全斷面隧道開挖之數值分析與現地量測之地表沉陷結果進行比較,分析時採用ABAQUS有限元素程式作為數值分析工具。研究內容主要可分成二大部份,第一部份針對曼谷MRTA地下鐵計畫中之三維非均質土層單隧道進行分析,分別考慮大地應力平衡、潛盾機推進及襯砌和回填灌漿之作用,對二維及三維問題進行分析,討論各時期地表沉陷及離開挖面遠距離處是否達到平面應變狀態;第二部分為分析北宜高速公路彭山隧道之三維隧道交叉段開挖問題,討論人行聯絡橫坑開挖時造成隧道頂拱沉陷及三維力學行為。
在這二部份中,皆考慮土壤不排水狀況,使用Mohr-Coulomb彈塑性準則,對不同案例分別討論地表沉陷槽曲線、大地應力及位移場之影響趨勢,並將結果與現地觀測數值進行比較驗證。
The objective of this study is comparing the full excavation of ground settlement results from numerical analysis with in-site observation. The program of this numerical analysis is adopting ABAQUS.
The study can be divided into two parts mainly. The first part is in accordance with MRTA project in Bangkok for non-homogeneous soil layers tunnel in analysis, which considering the earth stress balanced, EPB shield tunneling advance, lining and backfill grouting material. In this project, we can use two-dimensional and three-dimensional analysis to observe the results of ground settlement. Furthermore, it may suggest the tunnel facing away from monitoring station may have reached plane strain condition.
Secondly, it is the aim of this project to contemplate on the three-dimensional excavation of intersectional tunnel in Pongshan Tunnel of Taipei-Ilan Expressway. With regard to this, it can make a research on the three-dimensional mechanical behavior for bypass excavation.
In these two parts, Mohr-Coulomb material plasticity criterion is used for undrained behavior of soil. The different cases separately discuss the influence of the earth''s surface trough, earth stress and displacement field. As for the numerical analysis result, they will be compared with the results from in-site observation.
參考文獻
【1】Peck, R.B., "Deep Excavation and Tunneling in Soft Ground," Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, State-of-the-Art-Volume, pp. 255~290 (1969).
【2】Cording, E.J., and Hansmire, W.H., "Displacement Around Soft Ground Tunnels," Proceedings of 6th Pan-American Conference on Soil Mechanics and Foundation Engineering, Buenos Aires, pp. 571~633 (1975).
【3】Clough, G.W., and Schmidt, B., "Design and Performance of Excavations and Tunnels in Soft Clay," In Soft Clay Engineering, Elsevier Scientific Publishing Company, Amsterdam, Netherlands, pp. 600~634 (1981).
【4】Fang, Y.S., Pan, M.D., and Lin, G.J., "Time and Settlement in EPB Shield Tunneling," Tunnels and Tunneling, pp. 27~28 (1993).
【5】Butler, R.A., and Hampton, D., "Subsidence over Soft Ground Tunnel," Journal of Geotechnical Engineering Division, ASCE, Vol. 101, No. 1, pp. 35~49 (1975).
【6】Hansmire, W.H., and Cording, E.J., "Discussion of Subsidence over Soft Ground Tunnel," Journal of Geotechnical Engineering Division, ASCE, Vol. 102, No. 3, pp. 259~261 (1976).
【7】Hansmire, W.H., and Cording, E.J., "Soil Tunnel Test Section Case History Summary," Journal of Geotechnical Engineering, ASCE, Vol. 111, No. 11, pp. 1301~1320 (1985).
【8】Perez, S.A., "Experience gained through tunnel instrumentation," Proceedings of 10th International Conference on Soil Mechanics and Foundation Engineering, pp. 345~352 (1981).
【9】Aoki, T., and Jang, H.K., "Determination of Plastic Regions Around Underground Openings by a Coupled Boundary Element-Characteristic Method," International Journal for Numerical and Analytical Methods in Geomechanics, Vol. 16, pp. 701~716 (1992).
【10】Detournay, E., and Fairhurst, C., "Two-dimensional Elastoplastic Analysis of a Long Cylindrical Cavity Under Non-Hydrostatic Loading," International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts, Vol. 24, No. 4, pp. 197~211 (1978).
【11】Finno, R.J., and Clough, G.W., "Evaluation of Soil Response to EPB Shield Tunneling," Journal of Geotechnical Engineering, ASCE, Vol. 111, No. 2, pp. 155~173 (1985).
【12】Hisatake, T., and Ito, T., "Estimation method of ground surface subsidence due to parallel shields tunneling and its application to practical problems," Proceeding of the Japanese Society of Civil Engineers, Japanese, pp. 75~83 (1983).
【13】Ou, C.Y., and Cherng, J.C., "Effect of tail void closure on Ground Movement During Shield Tunneling in Sandy Soil," Journal of Asian Geotechnical Society, Geotechnical Engineering, Vol. 26, No. 1, pp. 17~32 (1995).
【14】Sloan, S.W., and Assadi, A., "Undrained stability of a plane strain heading," Canadian Geotechnical Journal, Vol. 31, pp. 443~450 (1994).
【15】方永壽,「台北市潛盾機隧道施工對地盤沉陷之影響」,行政院國科會專題研究報告,新竹 (1990)。
【16】鄭建志,「軟地通隧引致地盤沉陷之有限元素分析」,碩士論文,
國立中央大學土木工程研究所,中壢 (1999)。
【17】林建良,「潛盾隧道周圍土壓力之分布」,碩士論文,國立中央
大學土木工程研究所,中壢 (1999)。
【18】吳淑媛,「軟土隧道襯砌應力與地盤變位之數值分析」,碩士論文,國立中央大學土木工程研究所,中壢 (2001)。
【19】彭德俊,「黏土層中併行潛盾隧道互制現象之有限元素分析」,
碩士論文,國立中央大學土木工程研究所,中壢 (2000)。
【20】陳翰平,「潛盾隧道開挖沉陷之有限元素分析」,碩士論文,國立中央大學土木工程研究所,中壢 (2001)。
【21】李金芳,「黏土層中潛盾隧道開挖沉陷之有限元素分析」,碩士論文,國立中央大學土木工程研究所,中壢 (2002)。
【22】張軒誌,「潛盾隧道開挖沉陷與襯砌行為之有限元素分析」,碩士論文,國立中央大學土木工程研究所,中壢(2003)。
【23】Lin, D.G, Tseng, C.T., Phienwej, N., and Suwansawat, S., "3-D Deformation Analysis of Earth Pressure Balance Shield Tunnelling in Bangkok Subsoil," Journal of the Southeast Asian Geotechnical Society, Vol. 33, No. 1, April Issue, pp. 13-27 (2002).
【24】葉進賢,「均質與非均質土層潛盾隧道開挖沉陷之有限元素分析」,碩士論文,國立中央大學土木工程研究所,中壢 (2004)。
【25】 Karakus, M., Fowell, R.J., "Effects of different tunnel face advance excavation on the settlement by FEM," Tunnelling and Underground Space Technology, Vol. 185, pp 513-523 (2003).
【26】游步上,「隧道交叉段之三維變形量測與參數分析」,博士論文,國立台灣科技大學營建工程研究所,台北 (1999)。